Project 2: Demolish storage buildings, build pool with facilities and out buildings

Download PDF plans

Project details:

This project was to demolish the existing storage buildings and build a new swimming pool with facilities and out buildings. For this project ORA Design advised the client that Planning approval may not be straight forward due to heavy development already on the site. ORA Design prepared a minimal drawing package for a pre-Planning advice application.

"A minimal drawing package for a pre-planning advice application, saves costly redesign after a potential 'no' from planning"